WhiteBlaze Pages 2024
A Complete Appalachian Trail Guidebook.
AVAILABLE NOW. $4 for interactive PDF(smartphone version)
Read more here WhiteBlaze Pages Store

Page 2 of 2 FirstFirst 1 2
Results 21 to 22 of 22
  1. #21
    imscotty's Avatar
    Join Date
    11-13-2011
    Location
    North Reading, MA
    Age
    64
    Posts
    1,271
    Images
    7

    Default

    Quote Originally Posted by rafe View Post
    I have to assume the folks at GMC know what they're doing, but the bridge location does seem odd, as you point out. It will require a lot of rerouting of the trail on both sides of the river, apparently.
    If you look at the eventual proposed re-route in Rafe's post (post #11), the plan call for moving the trail off the Duxbury Road and along the river to get to the bridge. I think that a river walk in that area would be very nice. Safe to assume I think that the GMC does indeed know what they are doing.

    I appreciate all there work and efforts here and over the length of the beautiful Long Trail.

  2. #22
    Registered User graydog's Avatar
    Join Date
    08-26-2014
    Location
    holyoke, Ma.
    Age
    63
    Posts
    7

    Default

    you make some good points (have not hiked the LT yet but I will this Sept if things go well)

Page 2 of 2 FirstFirst 1 2
++ New Posts ++

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •