The new boardwalk in Pawling Ny similar to the one near Vernon NJ will be having more work completed form 4/22 to 4/26. If you are interested in this shoot me a Pa and I'll give you as much info as I can.

There will be more work periods spread throughout the year trying to get as much of the boardwalk completed as possible. The total length will be something like 1500'.

Here is a pic of the new stuff that was done in Oct.